Step by step guide & list of documents for Second Storey Addition in

Expanding your home with a second-story addition is a significant project that typically requires thorough planning and permits. Here’s a step-by-step guide and a list of documents you’ll likely need when adding a second story to your home:

Step 1: Consult with a Professional

Before diving into the process, consult with an architect, engineer, or contractor who has experience with second-story additions. They can provide valuable insights into the feasibility of your project and help you with the following steps:

Step 2: Determine Permit Requirements

Contact your local municipal building department to determine the specific permit requirements for second-story additions in your area. Each jurisdiction may have its own regulations and processes.

Step 3: Create a Detailed Design

Work with an architect or designer to create detailed architectural drawings and plans for your second-story addition. These plans should include:

1. Architectural Drawings: Floor plans, elevations, and cross-sections that illustrate the proposed addition, including the layout of rooms, windows, and doors.

2. Structural Engineering Plans: Detailed plans for the structural elements of the addition, ensuring it meets safety standards.

3. HVAC Plans: Plans for heating, ventilation, and air conditioning systems in the new space.

4. Plumbing and Electrical Plans: Detailed plans for plumbing and electrical systems in the new addition, following local codes.

Step 4: Gather Required Documents

Here is a comprehensive list of documents you’ll likely need for your second-story addition permit application:

1. Building Permit Application Form: Obtain this form from your local building department and complete it with project details, property information, and contact information.

2. Site Plan: Include a site plan showing your property’s existing structures, property lines, and nearby buildings. This helps assess setbacks and zoning requirements.

3. Architectural Drawings: Provide the detailed architectural drawings mentioned above.

4. Structural Engineering Plans: Include the engineer’s plans for the structural aspects of the addition.

5. HVAC Plans: If applicable, submit plans for heating, ventilation, and air conditioning systems.

6. Plumbing and Electrical Plans: Include detailed plans for plumbing and electrical work in the addition.

7. Fire Safety Plans: If required, incorporate fire safety measures such as smoke detectors and fire exits into your plans.

8. Property Survey: Ensure you have a recent property survey to verify boundaries and setbacks.

9. Zoning Compliance: Confirm that your project complies with local zoning bylaws, including setbacks, lot coverage, and height restrictions.

10. Application Fee: Be prepared to pay the application fee, which varies based on your project’s scope.

11. Neighbor Notifications: Notify neighboring properties about your project and collect their feedback or consent if required.

12. Energy Efficiency Compliance: Ensure your addition meets energy efficiency standards and provide documentation demonstrating compliance.

13. Accessibility Compliance: Check if accessibility standards apply to your project and ensure compliance.

14. Health and Safety Compliance: Comply with health and safety regulations, providing safety plans and documentation if necessary.

Step 5: Submit Your Application

Compile all the required documents and submit your application to the local building department. Ensure you’ve included all necessary forms, plans, and fees.

Step 6: Review and Approval Process

Your application will undergo a review process, during which the building department will assess your plans for compliance with building codes, zoning regulations, and safety standards. This review may take